The nation is bolstering its energy security with a substantial influx of Liquefied Natural Gas (LNG), importing approximately 1.92 lakh tonnes to safeguard against potential disruptions amid heightened geopolitical tensions in the Middle East. This strategic move by state-run Petrobangla aims to ensure a consistent and reliable energy supply across the country.
Key LNG Shipments Underway
Petrobangla has outlined an ambitious schedule for the arrival of these critical LNG consignments. The shipments are originating from diverse global suppliers, including Australia, Indonesia, and the United States. These will be transported via three distinct vessels, all scheduled to dock and commence offloading within the coming ten days.
The first of these vital shipments has already reached its destination. The Liberian-flagged tanker, ‘HL Puffin’, carrying an estimated 62,000 tonnes of LNG sourced from Australia, has successfully arrived at Chattogram port. Port authorities have confirmed the vessel’s arrival and that preparations are actively underway to facilitate the discharge of its cargo. The LNG will be transferred to the Floating Storage and Regasification Unit (FSRU) operated by RPGCL, strategically located in Moheshkhali in the Bay of Bengal.
Further Consignments En Route
The momentum of LNG imports is set to continue with additional vessels making their way to Bangladeshi shores. Chatogram Port sources indicate that another LNG carrier, named ‘New Brave’, is anticipated to arrive at the port on March 27. This vessel, also sailing under the Liberian flag, is carrying a significant payload of nearly 61,500 tonnes of LNG, procured from Indonesia.
Adding to the robust supply chain, a third vessel, the ‘Celsius Galapagos’, is slated for arrival in Bangladesh on April 4. This tanker, which flies the flag of the Marshall Islands, is bringing a substantial quantity of approximately 70,000 tonnes of liquefied gas, originating from the United States.
Addressing Global Energy Market Volatility
The current global energy landscape is characterized by significant volatility, largely influenced by ongoing conflicts and geopolitical shifts in the Middle East. Md. Omar Faruk, Secretary of the Chattogram Port Authority (CPA), acknowledged the impact of these international developments, stating that the global energy crisis, triggered by the Middle East situation, is indeed being felt in Bangladesh.
In response to these challenges, the CPA is implementing measures to prioritize the smooth and efficient handling of energy-related vessels. This includes expediting the berthing process and the discharging of fuel cargoes. The objective is to maintain an uninterrupted flow of essential energy resources to meet domestic demand.
Mr. Faruk elaborated on the ongoing operations, confirming, “One ship with 62,000 tonnes has already arrived. Another is expected this Friday, and a third consignment from the US will reach us by April 4.” This multi-pronged approach underscores the nation’s commitment to securing its energy future through proactive import strategies and efficient port operations, even in the face of international instability. The timely arrival of these LNG shipments is crucial for meeting the country’s energy needs and supporting its economic activities.



